

Commercial Construction Quantity Takeoffs
48-72h
turnaround window
32
CSI divisions handled
100%
itemized takeoffs
Estimating Scope by Division
Every project file includes transparent line items, labor assembly calculations, and vendor-ready quantity spreadsheets structured for immediate submission.
Trade Quantity Takeoffs
Material Assembly Sheets
Bid-Day Summary Files
Exact square-foot and linear dimensions calculated for drywall, mechanical, framing, electrical, and concrete subcontractor packages.
Granular bill of materials including fastener density, waste factors, and specific manufacturer schedule allowances.
Pre-formatted Excel and Planswift export summaries organized strictly by CSI MasterFormat division numbers.
Every square foot accounted for down to specified fastener density and engineering notes.
We do not produce loose square-foot assumptions. Every line item matches your contract plan set, addenda notifications, and mechanical schedules directly.
Upload architectural PDFs and structural drawing sets before noon to secure a firm scope proposal and guaranteed delivery schedule within 24 hours.
